The challenge
Executing a high-tensile reinforcement underlay for a rapid runway upgrade within strict night-shift windows to avoid flight schedule disruptions.
Our solution
Supplied 7,00,000+ sq mtrs of prefabricated, drop-and-place Nexus Reinforce TMT structural weldmesh. The precision machine welds eliminated manually tied steel grids, cutting installation times by 65%.
The results
Accelerated concrete paving schedules, completing the runway construction in record time with perfect load-bearing uniformity.